edit_a_project
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| edit_a_project [2023/11/30 13:36] – created chris | edit_a_project [2023/11/30 15:21] (current) – chris | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Edit A Project ====== | ====== Edit A Project ====== | ||
| - | After hitting " | + | After hitting " |
| - | {{ :pma.control_2.0_create_a_project.mp4 | + | {{ :Control_Edit open.png? |
| - | First navigate | + | Here you have access |
| + | - Ordered List Itemsee an overview of the project Details | ||
| + | - Edit the project options chosen during [[Create a project]] | ||
| + | - [[Additional material and links|Add additional material]] | ||
| + | - [[Additional material | ||
| + | - Perform [[Integrity check|integrity checks]] | ||
| + | - Create | ||
| - | {{ :Control_Projects.png?800 |}} | + | {{ :Control_Editing Project.png? |
| + | |||
| + | === Project Details === | ||
| + | |||
| + | Here you can get an overview of what content and training sessions is already in the project. If no content has been added yet, you are made aware by the orange text and can click the bluetext link to get started | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | === Adding Material and Links=== | ||
| + | |||
| + | In these tabs you can add material and links, and see anything that has already been added | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | {{ : | ||
edit_a_project.1701347783.txt.gz · Last modified: by chris
